Planning & Development Services Applications, Fees & Forms

Doc app

Document Center

The Document Center provides easy access to public documents. Click on one of the categories below to see related documents or use the search function.

Search for file name:

Categories always sorted by seq (sub-categories sorted within each category)
Documents sorted by SEQ in Ascending Order within category

No documents

Applications25 documents

  • Address Request Application
    document seq 1.00
  • Engineering Review Process Application
    document seq 2.00
  • Environmental Features Setback Permit Application.pdf
    document seq 3.00
  • EFS/Environmental Commission Application Instructions
    document seq 3.10
  • Part 91 Grading & Drainage/Soil Erosion Sedimentation Control (SESC) / Chapter 24 Pavement Improvement Permit Application
    document seq 4.00
  • Part 91 Grading & Drainage/SESC Permit Letter of Authorization
    document seq 4.10
  • Soil Erosion Permit Transfer Form
    document seq 4.20
  • EGLE Joint Application (MDEQ)
    document seq 4.50
  • Grinder Pump Process Application
    document seq 5.00
  • Outdoor Seating Permit Application
    document seq 6.00
  • Rezoning Application
    document seq 7.00
  • Right of Way Disruption Permit Application
    document seq 8.00
  • Septic - Disposal System Transfer Evaluation Form
    document seq 9.00
  • Sign Permit Application
    document seq 10.00
  • Sign Permit Check-List
    document seq 10.10
  • Site & Sketch Plan Application
    document seq 11.00
  • Township Emblem Form
    document seq 13.00
  • Water/Sewer Main Connection Application
    document seq 13.50
  • Waiver Request Application
    document seq 14.00
  • Wetland Determination Application
    document seq 15.00
  • Wetland Permit Application
    document seq 16.00
  • Woodland Determination Application
    document seq 18.00
  • Woodland Overlay District Permit Application
    document seq 19.00
  • Woodland Overlay District Permit Application Supplement
    document seq 19.10
  • ZBA Application
    document seq 20.00

Fees2 documents

  • PDS Fee Schedule
    document seq 1.00
  • Planning Fees
    document seq 2.00

Miscellaneous Forms and Lists9 documents

  • Transmittal Form
    document seq 1.00
  • Map Request
    document seq 3.00
  • Engineers and Surveyors List
    document seq 4.00
  • Grinder Pump Operation Procedures
    document seq 5.00
  • Grinder Pump Installation Procedures
    document seq 5.10
  • SAD Procedures
    document seq 6.00
  • SAD_FAQ's
    document seq 6.10
  • Water/Sewer Service Connection Procedures
    document seq 20.00
  • FOIA
    document seq 21.00

Engineering Review & Utility Dedication15 documents

  • Engineering Process Packet
    document seq 1.00
  • Engineering Plan Review Check-List
    document seq 2.00
  • Pre-Con Check-List
    document seq 3.00
  • As-Built Check-List
    document seq 4.00
  • Project Close Out Check-List
    document seq 5.00
  • Dedication Process Packet
    document seq 7.00
  • Dedication Item #1_Quit Claim Deed
    document seq 7.10
    Township Standard Form
  • Dedicaton Item #2 - Seperate Costs
    document seq 7.20
    Sample
  • Dedication Item #3_Easement
    document seq 7.30
    Township Standard Form
  • Dedication Item #4_Title Insurance
    document seq 7.40
    Sample
  • Dedication Item #5_As Built Certification
    document seq 7.50
    Standard Verbiage
  • Dedication Item #7_Full Unconditional Waiver of Lein
    document seq 7.70
    Sample
  • Dedication Item #8_Maintenance Bond
    document seq 7.80
    Standard Form (Cash bond forms available upon request)
  • Dedication Item #9_Storm Water
    document seq 7.90
    Standard Form
  • Dedication Item #9_Storm Water LOC
    document seq 7.91
    Standard Form (Cash bond form available upon request)

Standard Plans8 documents

  • SESC Control Details
    document seq 1.00
  • Low-Pressure Sanitary Sewer 1
    document seq 2.00
  • Low-Pressure Sanitary Sewer 2
    document seq 3.00
  • Non-Motorized Pathway and Bridge
    document seq 4.00
  • Sanitary Sewer Notes and Details
    document seq 5.00
  • WCR Soil Erosion-Sedimentation Notes and Control Details
    document seq 6.00
  • WCR Storm Drain Notes and Details
    document seq 7.00
  • Water Main Details
    document seq 8.00