Planning & Development Services Applications, Fees, Forms

Doc app

Document Center

The Document Center provides easy access to public documents. Click on one of the categories below to see related documents or use the search function.

Categories always sorted by seq (sub-categories sorted within each category)
Documents sorted by SEQ in Ascending Order within category

Planning & Development Services Department2 documents

  • FOIA Request Form
    document seq 1.00
  • Transmittal Form
    document seq 2.00

Engineering Services46 documents

Applications6 documents

  • Engineering Process Application.pdf
    document seq 0.00
    Site Improvements: Sanitary Sewer, Water Main, Storm Drainage, Site Grading, Paving
  • ENG Review Process Packet 2019.pdf
    document seq 1.20
  • Grading, Drainage, SESC Permit Application
    document seq 2.00
    Ch 18 - Part 91 Grading & Drainage, Soil Erosion & Sedimentation Control. Ch 24 - Pavement Improvement
  • Grinder Pump Process Application
    document seq 3.00
  • Right-of-Way Disruption Permit Application
    document seq 4.00
    Disruption to any township Right-of-Way, Easement or Public Space: Overhead, Fiberoptic, Gas, Electric, Cable, Telecommunication & Underground.
  • Water Sewer Main Connection Process Application
    document seq 5.00
    Connection or Lead to an existing line that has not been previously constructed.

Forms21 documents

  • As-Built Check-List
    document seq 1.00
  • Plan Review Check-List
    document seq 2.00
  • Pre-Con checklist
    document seq 3.00
  • Project Close-Out Check-List
    document seq 4.00
  • EGLE Part 41 Permit Application
    document seq 5.00
    complete on-Line @ https://www.michigan.gov/egle
  • EGLE Act 399 Permit Application
    document seq 5.10
    Complete on-Line @ https://www.michigan.gov/egle
  • EGLE Certification Statement
    document seq 5.30
  • Grinder Pump_Installation Procedures
    document seq 7.00
  • Grinder Pump_Operation Procedures
    document seq 7.20
  • Grinder Pump_ System Easement and Instructions
    document seq 7.30
  • Grinder Pump_FAQ
    document seq 7.40
  • Septic Disposal System Transfer Evaluation Form
    document seq 8.00
  • Soil Erosion Permit Transfer Form
    document seq 9.00
  • ADA Standards
    document seq 10.00
  • Water Detail
    document seq 11.00
  • WBT Water Details 2020 .pdf
    document seq 11.00
  • WBT Storm Standard Detail
    document seq 12.00
  • WBT Sanitary Sewer Standard
    document seq 13.00
  • WBT Low Pressure SS_1
    document seq 14.10
  • WBT Low Pressure SS Detail_2
    document seq 14.20
  • WBT Safety Path_Bridge Detail
    document seq 14.30

Dedication12 documents

  • Dedication Process Checklist
    document seq 0.00
  • Quit Claim Deed
    document seq 1.00
  • Easement Form
    document seq 3.00
  • Maintenance Guarantee Bond
    document seq 8.00
  • Maintenance Guarantee Bond
    document seq 8.00
  • Maintenance Bond _Cash
    document seq 8.20
  • Stormwater Management Agreement
    document seq 9.00
    Private System - Maintenance & Easement Agreement
  • Stormwater - Exhibit A
    document seq 9.10
    Private System - Property
  • Stormwater - Exhibit B
    document seq 9.20
    Private System - Facility
  • Stormwater Management Letter of Credit
    document seq 9.30
  • Stormwater Performance Guarantee Cash Bond
    document seq 9.40
  • Instructions for Execution of Deeds and Easements
    document seq 10.00

Dedication Document Samples7 documents

  • 1 - Quit Claim Deed
    document seq 1.00
  • 2 - Utility Costs - Installed
    document seq 2.00
  • 3 - Water Main Easement
    document seq 3.00
  • 4 - ALTA Commit for Title Ins
    document seq 4.00
  • 7 - Waiver Lein
    document seq 7.00
  • Item 9c. FIRST inspection Ch 18
    document seq 9.30
  • Item 9d. second inspection Ch 18
    document seq 9.40

Environmental Services8 documents

Applications6 documents

  • Environmental Features Setback Permit Application
    document seq 0.00
    Fill, Dredge, Build, Install or any action in Wetland, Watercourse, Floodplain, or Environmental Feature Setback (EFS)
  • Wetland Permit Application
    document seq 1.00
  • Wetland Determination Application
    document seq 2.10
  • Wetland Determination Verification Application
    document seq 2.20
  • Woodland Overlay District Permit Application
    document seq 3.00
  • Woodland Determination Application
    document seq 3.20

Forms2 documents

  • invasive plant species
    document seq 1.00
  • Native Plants
    document seq 2.00

Planning Services13 documents

Applications10 documents

  • Address Request Form
    document seq 1.00
  • Collection Box Permit Application
    document seq 1.50
  • Film Application
    document seq 2.00
  • Outdoor Seating Permit Application
    document seq 3.00
  • Sign Permit Application
    document seq 4.00
    Construction, Ground (Change of Face), Wall, Real Estate Development, Temporary, Community Special Event
  • Site and Sketch Plan Application
    document seq 5.00
  • Site Plan Extension Application
    document seq 5.10
  • Temporary Structure or Use Application
    document seq 5.20
  • Waiver Request Application
    document seq 6.00
    Outdoor Storage Lake Items.  Wind/Solar
  • Rezoning Application
    document seq 7.00

Forms3 documents

  • Copyright Disclaimer
    document seq 1.00
  • Sign Permit Check-list
    document seq 2.00
  • Township Emblem Form
    document seq 3.00

Zoning1 document

Applications1 document

  • ZBA Application
    document seq 1.00
    Residential/Commercial appeals for Zoning Variance

FormsNo documents